"Apex is a sophisticated, minimalist theme. It looks great and performs wonderfully on mobile devices, tablets, laptops, and everything in between. Use it to setup a business blog, newspaper website, fashion magazine, or travel blog. Now with WooCommerce support, you can even setup an eCommerce store with Apex. The design of this minimal theme also suits media-rich sites well like food blogs and personal photography portfolios. As a simple, responsive, and SEO optimized theme, you can trust Apex to present your best content to the world. Apex is also fully compatible with the new Gutenberg post editor. Preview Apex now with the interactive live demo: https://www.competethemes.com/demos/?theme=apex"
-
Compete Themes (theme author)
Theme Details
| Websites Found | 290 |
| URI | www.competethemes.com/apex/ |
| Version | 1.41 |
| Author | Compete Themes |
| Author URI | www.competethemes.com |
| License | GNU General Public License v2 or later |
| Tags | two-columns, right-sidebar, accessibility-ready, custom-logo, custom-menu, featured-images, full-width-template, rtl-language-support, sticky-post, theme-options, threaded-comments, translation-ready, blog, education, news |
Popular Sites
We crawl the top 1+ million sites and these are the most popular websites we've found using the Apex WordPress theme.

rotsvast.nl

magischerfc.de

imtanvirhasan.com

okteam.ba

colitis-ulcerosa-behandling.dk

ebuilder.ee
Websites Per Theme Version
| Version | Websites | |
|---|
| 1.41 | 7 | 3.333% |
| 1.40 | 25 | 11.9% |
| 1.39 | 25 | 11.9% |
| 1.38 | 14 | 6.667% |
| 1.37 | 13 | 6.19% |
| 1.36 | 1 | 0.476% |
| 1.35 | 4 | 1.905% |
| 1.34 | 4 | 1.905% |
| 1.33 | 12 | 5.714% |
| 1.32 | 4 | 1.905% |
| 1.31 | 2 | 0.952% |
| 1.28 | 1 | 0.476% |
| 1.27 | 4 | 1.905% |
| 1.26 | 2 | 0.952% |
| 1.24 | 1 | 0.476% |
| 1.23 | 5 | 2.381% |
| 1.22 | 1 | 0.476% |
| 1.21 | 1 | 0.476% |
| 1.19 | 2 | 0.952% |
| 1.18.1 | 1 | 0.476% |
| 1.17 | 1 | 0.476% |
| 1.12 | 1 | 0.476% |
| 1.11 | 1 | 0.476% |
| 1.10.1 | 1 | 0.476% |
| 1.09 | 1 | 0.476% |
| 1.8.4 | 3 | 1.429% |
| 1.4.1 | 2 | 0.952% |
| 1.1.40 | 3 | 1.429% |
| 1.1.39 | 2 | 0.952% |
| 1.1.38 | 13 | 6.19% |
| 1.1.36 | 8 | 3.81% |
| 1.1.33 | 2 | 0.952% |
| 1.1.30 | 1 | 0.476% |
| 1.1.27 | 1 | 0.476% |
| 1.1.26 | 1 | 0.476% |
| 1.1.23 | 1 | 0.476% |
| 1.1.21 | 2 | 0.952% |
| 1.1.20 | 2 | 0.952% |
| 1.1.17 | 2 | 0.952% |
| 1.1.15 | 1 | 0.476% |
| 1.1.11 | 1 | 0.476% |
| 1.1.7 | 2 | 0.952% |
| 1.1.3 | 2 | 0.952% |
| 1.1.2 | 1 | 0.476% |
| 1.1.1 | 1 | 0.476% |
| 1.1.0 | 1 | 0.476% |
| 1.0.12 | 2 | 0.952% |
| 1.0.8 | 1 | 0.476% |
| 1.0.7 | 3 | 1.429% |
| 1.0.6 | 1 | 0.476% |
| 1.0.4 | 1 | 0.476% |
| 1.0.3 | 1 | 0.476% |
| 1.0.2 | 4 | 1.905% |
| 1.0.1 | 1 | 0.476% |
| 1.0 | 10 | 4.762% |