"Terrifico is a multi-purpose, clean, creative, and fully responsive WordPress theme that combines the stylish design and advanced functionality. Many aspects of the theme can be customized via Customizer. Things you can customize: theme colors, logo, navigation menu, typography, header, image slider, footer, layout settings and home page sections. Terrifico supports Google fonts, unlimited colors, animation and automatic image resizing. The FontAwesome icon pack delivers Retina Ready icons that look great on an iPad or other HD devices. 4 footer widget columns, scroll to top feature, social links, support for WooCommerce and Contact Form 7 plugins, five post formats and more."
-
Vitaly Pinchev (theme author)
Theme Details
| Websites Found | 77 |
| URI | vpthemes.com/terrifico/ |
| Version | 1.8.0 |
| Author | Vitaly Pinchev |
| Author URI | vpthemes.com |
| License | GNU General Public License v2 or later |
| Tags | one-column, two-columns, right-sidebar, left-sidebar, grid-layout, footer-widgets, blog, e-commerce, photography, custom-background, custom-menu, custom-colors, featured-images, post-formats, theme-options, threaded-comments, translation-ready, full-width-template, custom-header, featured-image-header |
Popular Sites
We crawl the top 1+ million sites and these are the most popular websites we've found using the Terrifico WordPress theme.

портал-пациента52.рф

profmaster.lv

iamdivpress.org

bandekarandsons.com

sspmdayschool.org

peikkometsanratsastuskoulu.fi
Websites Per Theme Version
| Version | Websites | |
|---|
| 1.8.0 | 60 | 89.55% |
| 1.7.6 | 7 | 10.45% |